COMPLETION MID-SUMMER 2019

Introducing a new high quality four unit warehouse development, strategically located in north Dartford, adjacent to Junction 1A of the M25.

Quadron provides a unique opportunity to acquire up to 45,338 sq ft of Grade A warehouse space in Dartford. The development will be built to the highest quality specification and is located at The Bridge, a mixed-use regeneration project that has delivered 1.8m sq ft of commercial accommodation for occupiers such as Mercedes, Nissan, Skoda and Sainsbury’s as well as residential, educational and local retail facilities. The Bridge also benefits from Fastrack public transport, linking the site to Dartford Town Centre and the Bluewater Shopping Centre complex.

Quality

Brand new industrial development built to deliver
the highest quality specification

Location

Established location at the heart of
The Bridge in Dartford

Accessibility

Easy access to the M25,
M2 and M20

Flexibility

Multiple combinations provide
units of 8,482 – 36,856 sq ft

GRADE A
FORMULA

All areas covered

Located at The Bridge,
a vast mixed-use
regeneration project

Fast and direct
access to the
UK motorway
network and ports

1,500 new
homes contributing
to a trusted local
labour pool

Science & Technology
education facilities offering
the opportunity to
develop relationships

80 acres of open space
and wildlife contributing
to a high quality
working environment

Excellent local amenities
including restaurants,
cafés and a local
shopping area

ideally

Positioned

The site is located at The Bridge in north Dartford, just off Bob Dunn Way (A206) and adjacent to Junction 1A of the M25, within close proximity to London Gateway.

By road, the A2, A20 and A13 dual carriageways provide excellent access to London, whilst the M25 offers direct access to the UK motorway network. The M20 and M2 lead to the gateway to Continental Europe for road freight – the ports of Folkestone, Dover and the Channel Tunnel.

By rail, Ebbsfleet International Railway Station runs a direct service to London St Pancras (18 mins) and Dartford Railway Station provides frequent services to London Charing Cross and London Victoria. From December 2019, the Elizabeth Line at Abbey Wood Crossrail Station will halve journey times to many Central London destinations.

By bus, Fastrack provides a frequent and reliable high quality service via express routes to numerous destinations, including Dartford Town Centre, Bluewater Shopping Centre & Ebbsfleet International.

M25 J1 0.8 miles
Dartford Station 3.1 miles
Ebbsfleet Station 5.5 miles
M20 J1 6.3 miles
Port of Tilbury 11.7 miles
London Gateway 14 miles
Blackwall Tunnel 14.2 miles
London City Airport 16.9 miles
Central London 21.1 miles

Proven

Quality

Warehouse
UNIT A
  • 8m eaves
  • 3 electric level access loading doors
  • 13 parking spaces
  • Secure side compound
  • 50 kN/m2 floor loading
  • 2 electric vehicle charging points
UNITS B, C, D
  • 10m eaves
  • 1 electric level access loading door
  • 13-16 parking spaces
  • 50 kN/m2 floor loading
  • 2 electric vehicle charging points
Offices
  • High quality office accommodation
  • Suspended ceilings with LG7 lighting
  • Comfort Cooling (VRF)
  • Carpet tiled floors
  • Raised access floors
  • Kitchenette
USE
  • 24/7 365 days
  • B1/B2/B8 consent
A PROVEN POSITION

The Bridge is home to many leading businesses, including:

  • DHL
  • Sainsbury’s
  • Nissan
  • Mercedes-Benz
  • Beefeater
  • Europa
  • Skoda
  • Premier Inn
  • SEM

Schedule of accommodation

Unit A
Unit B
Unit C
Unit D
Total
Ground Floor
7,169 sq ft
10,538 sq ft
10,344 sq ft
12,164 sq ft
40,215 sq ft
666 sq m
979 sq m
961 sq m
1,130 sq m
3,736 sq m

Approximate gross external areas

Unit A
Unit B
Unit C
Unit D
Total
First Floor Office
1,313 sq ft
1,238 sq ft
1,238 sq ft
1,335 sq ft
5,124 sq ft
122 sq m
115 sq m
115 sq m
124 sq m
476 sq m
Unit A
Unit B
Unit C
Unit D
Total
Total
8,482 sq ft
11,776 sq ft
11,582 sq ft
13,498 sq ft
45,338 sq ft
788 sq m
1,094 sq m
1,076 sq m
1,254 sq m
4,212 sq m

Build programme

Site Preparation November 2018
Ground Works Completed February 2019
Steel Works Completed March 2019
Cladding / Roof Completed April 2019
Floor Slab May 2019
Office Fit Out June 2019
Completion July 2019

Sustainability

  • Low energy internal lighting with PIR daylight control
  • Low energy high efficiency external LED lighting
  • Electric charging points for designated car parking spaces
  • 15% roof lights to the warehouse areas
  • BREEAM Very Good
  • An Energy Performance Certificate (EPC) targeting A will be available

Downloads

Click image to download

https://quadronpark.co.uk/wp-content/uploads/2018/10/brochure-cover@2x.png
X

PLEASE ENTER YOUR EMAIL ADDRESS BELOW TO ACCESS THE DOWNLOAD

Get in touch

For more information please contact

William Abbott

william.abbott@cbre.com

Jamie Hargreaves

jamie.hargreaves@cbre.com

Richard Seton-Clements

r.clements@glenny.co.uk

Andrew Hughes

a.hughes@glenny.co.uk